our projects
OUR WORK
Some of our distinctive works
Project to design (6) buildings, (2) blocks, and a mosque in the old city of Ras Lanuf - Libya.
Project Owner: RAS Lanuf Oil & Gas Manufacturing Company – Libya
Project Assignment Date: February 01, 2024
Project Items:
- Preparation and development of the technical proposal for the project, which includes: Proposed initial design represented in architectural, structural, electromechanical drawings, and 3D designs. Preparation of technical specifications, quantity take-offs, and itemized lists for the project. Preparation of work plan, quality plan, safety, and occupational health plan. Preparation of project schedule.
- Preparation and development of the financial proposal for the project, which includes: Preparation of cost estimation for the project with prices for each work item.
Expansion project for Marina El Hamra, 420 acres (Control & Substation Buildings) - Sidi Abdel Rahman, Alexandria.
Project Assignor: Petrojet Company – Northern Branch
Project Owner: Western Desert Petroleum Company (WEBPCO)
Assignment Date: December 6, 2023
Project Items:
- Supply and execution of reinforced hollow brick fire-resistant buildings for 120 minutes.
- Supply and application of internal and external plaster.
Expansion project for Marina El Hamra, 120 acres (Substation Building) - Sidi Abdel Rahman, Alexandria.
Project Assignor: Petrojet – Northern Branch
Project Owner: Western Desert Petroleum Company (WEBPCO)
Assignment Date: April 15, 2023
Project Items:
- Construction of fire-resistant silicate brick buildings for 120 minutes.
- Interior and exterior plastering works.
- Interior and exterior painting works.
Finishing project for Building Train D - Nahda Al-Amriya - Alexandria.
Project Assignor: Petrojet – Northern Branch
Project Owner: GASCO, The Egyptian Natural Gas Co.
Assignment Date: April 15, 2023
Project Items:
- Construction of fire-resistant silicate brick buildings for 120 minutes.
- Interior and exterior plastering works.
- Moisture insulation, thermal insulation, and sound insulation works.
- Epoxy flooring works.
- Interior and exterior painting works.
- Plumbing and electrical works.
- Supply and installation of raised floors (Polygroup – Spain).
- Installation of suspended ceilings (Armostron & Knauf).
- Supply and installation of marble and granite cladding and flooring.
- Supply and installation of HPL partitions.
- Supply and installation of HPL flooring and carpeting.
- Installation of curtain walls and aluminum handrails.
Renovation and renewal operation for Alumetal windows on the facade of the Ibrahimia Technical Branch building.
Project Assignor: Alexandria Electricity Distribution Company
Assignment Date: April 05, 2022
Project Items:
- Supply and installation of PS & JUMBO sector aluminum windows and doors with sliding, hinged, and fixed mechanisms.
- Supply and installation of fixed office partitions.
Renovation operation for the mechanical garage of Al-Hamliya in Ras El Souda district, affiliated with Montaza First Neighborhood.
Project Assignor: Al-Montaza First District – Alexandria Governorate
Assignment Date: May 31, 2022
Project Items:
- Structural restoration works for buildings (ceilings, beams, columns).
- Insulation and treatment of joints.
- Helicopter and epoxy flooring works for the garage area.
- Various architectural finishing works.
Major maintenance and repair operation for the transformer rooms in West Alexandria.
Project Assignor: Alexandria Electricity Distribution Company
Assignment Date: January 04, 2021
Project Items:
- Structural restoration works for buildings (ceilings, beams, columns).
- Insulation and treatment of joints.
- Various architectural finishing works.
Neighborhood development operation for Montaza First district, addressing the neighborhood's needs for the fiscal year 2020/2021.
Project Assignor: Al-Montaza First District – Alexandria Governorate
Assignment Date: March 18, 2021
Project Items:
- Replacement and renewal of ceramic and marble flooring and walls.
- Renovation of public and private bathrooms including all fixtures.
- Renewal of paintings and treatment of walls.
- Restoration of damaged structural elements.
Construction operation of a new mosque at the Egypt Chemical Industries Company - Mex, Alexandria.
Assignor: Egypt Chemical Industries Company
Consultant: National Center for Housing Research
Assignment Date: May 29, 2021
Project Items:
- Architectural redesign of the mosque to align with client requirements.
- Excavation and water drainage works.
- Ordinary and reinforced concrete works for foundations and structural elements.
- Comprehensive finishing works up to furnished delivery.
Pouring, screeding, and opening of floor joints operation at the WOTECH Wood Factory - Edko.
Assignor: Petrojet – Northern Branch
Project Owner: WPTECH
Assignment Date: May 8, 2021
Project Items:
- Helicopter pouring, screeding, and finishing of floors.
- SAWCUT joint opening works.
- Milled joint works.
Renovation and maintenance operation for filling canopies in the Alexandria area - Mex Alexandria.
Assignor: Petrogas Petroleum Gases Company
Assignment Date: June 7, 2021
Project Items:
- Structural restoration works for gas filling canopies using shotcrete, screeding, and painting.
- Renovation and renewal of canopy roofs (demolition, sloped concrete, moisture insulation, drainage, tiling).
- Rough plastering and graffiti works, both interior and exterior.
Rehabilitation operation for the northern fence - Egypt Chemical Industries Company - Mex Alexandria.
Assignor: Egypt Chemical Industries Company
Consultant: National Center for Housing Research
Assignment Date: June 14, 2021
Project Items:
- Demolition and removal of upper part debris of the fence.
- Reinforced concrete works for columns and beams of the fence.
- Construction, plastering, and graffiti works for the entire fence.
- Installation of barbed wire.
Summer maintenance operation for buildings and facilities at the Academy's headquarters in Abi Qir and Miami - Alexandria.
Assignor: Arab Academy for Science, Technology & Maritime Transport
Assignment Date: August 03, 2021
Project Items:
- Flooring and wall demolition works.
- Roof insulation works.
- Suspended ceiling installation.
- Facade plastering and graffiti works.
- Roof, pavement, and corridor tiling works.
- Painting works.
- Structural and expansion joint works.
Renovation and renewal operation for transportation workshops in Alexandria - Alexandria.
Assignor: Arzam General Contracting
Owner: Petrogas Petroleum Gases Company
Assignment Date: December 19, 2020
Project Items:
- Excavation and breaking of reinforced concrete floors.
- Piling works.
- Reinforced concrete works.
- Reinforced concrete slab works.
- Underground drainage pathways works.
- Sanitary and electrical chamber works.
Development operation for 6 bathrooms in building (A), 3 bathrooms in building (B), and 25 bathrooms in hotel (C) at the Academy headquarters in Abi Qir.
Assignor: Arab Academy for Science, Technology & Maritime Transport in Abu Qir
Assignment Date: July 03, 2019
Project Items:
- Demolition of walls and floors.
- Plumbing and electrical installation works.
- Supply and installation of wooden and aluminum doors.
- Suspended ceiling and painting works.
- Marble and granite works.
- Electrical and plumbing finishing works.
Finishing operation for the expansion project of Medawar Factory - Free Zone - Al-Amriya.
Assignor: Red Sea Contracting
Owner: Petrojet Northern Branch
Assignment Date: April 19, 2019
Project Items:
- Construction and internal and external plastering.
- Interior and exterior painting works.
- Installation of gypsum board ceilings and walls, and tiles.
- Metal structure and sheet metal roofing works.
- Ceramic flooring and wall works.
Finishing operation for buildings and whitewashing at the Saudi German Hospital Alexandria West - Alexandria.
Assignor: IHCC OR Construction
Owner: Petrojet Northern Branch
Assignment Date: April 19, 2019
Project Items:
- Internal and external building works.
- Internal and external whitewashing.
Renovation operation for the facades of buildings (A & B) at the Faculty of Engineering and Technology at the Academy headquarters in Abu Qir - Alexandria.
Assignor: Arab Academy for Science, Technology & Maritime Transport in Abu Qir
Assignment Date: August 30, 2018
Project Items:
- Renovation and maintenance of the concrete structure (columns, beams, lintels).
- Rough plastering and facade cladding.
Development operation for 6 bathrooms in building (A), 3 bathrooms in building (B), and 25 bathrooms in hotel (C) at the headquarters of the Arab Academy in Abu Qir.
Assignor: Arab Academy for Science, Technology & Maritime Transport in Abu Qir
Assignment Date: July 03, 2019
Project Items:
- Demolition of walls and floors.
- Plumbing and electrical installation works.
- Supply and installation of wooden and aluminum doors.
- Suspended ceiling and painting works.
- Marble and granite works.
- Electrical and plumbing finishing works.
Demolition and purchase of debris of the "Al-Sheraa" cafeteria in the Maritime College area at the headquarters of the Arab Academy in Abu Qir, Alexandria.
Assignor: Arab Academy for Science, Technology & Maritime Transport
Assignment Date: June 03, 2018
Project Items:
- Demolition and removal of waste to public landfills.
- Excavation to the required level.
Renovation and renewal of aluminum sections in Housing Building (B) at the Arab Academy, Abu Qir - Alexandria.
Assignor: Arab Academy for Science, Technology & Maritime Transport
Assignment Date: January 03, 2018
Project Items:
- Removal of old doors and windows.
- Supply and installation of doors and windows from JUMBO/SH sector.
- Various finishing works (marble seats, whitewash coatings, paintings, gypsum board).
Rehabilitation and Renewal of Balcony Railings in Buildings A and B at the Arab Academy for Science, Technology & Maritime Transport - Abu Qir, Alexandria
Assignor: Arab Academy for Science, Technology, and Maritime Transport
Date of Assignment: 2016-2017
Project Items:
- Breaking and dismantling of handrails.
- Installation of iron signposts.
- Reinforced concrete for supports.
- Exterior and interior plastering and grouting.
- Supply and installation of bollards made of pipes.
Design and Execution of Dr. Medhat Salman's Villa - Borg El Arab, Alexandria
Assignor: Dr. Medhat Salman
Project Items:
- Site inspection.
- Architectural, structural, electrical, and plumbing design, as well as 3D visualizations, subject to client approval.
- Execution of all phases of the project, starting from excavation and foundations to finishing touches and key handover.
We are an institution specialized in the field of contracting and construction, where we provide our services based on quality and professionalism at every step. We strive to achieve customer satisfaction by providing innovative and reliable solutions in the building and construction fields, while adhering to deadlines and high technical standards.
- Tower A, Golden City Towers, Apartment 205, Mostafa Kamel St., next to Carrefour City Light, Alexandria.
- 01280354541 01281310751 01095443131 - 01011318488
- Fax: +2035372018
- info@alhamadcs.com
- office.alhamadest@gmail.com
our company
social media
work time
- Saturday to Thursday: 8:00 AM - 6:00 PM